{"id":1572,"date":"2022-01-24T09:12:00","date_gmt":"2022-01-24T08:12:00","guid":{"rendered":"https:\/\/iselenergia.com\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/"},"modified":"2023-02-01T13:50:02","modified_gmt":"2023-02-01T12:50:02","slug":"isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park","status":"publish","type":"post","link":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/","title":{"rendered":"Isel begins work in the installation of the new Revilla-Vallejera Photovoltaic Plant"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">During the last months we have started to work on the implementation of the photovoltaic park of Revilla-Vallejera, in the province of Burgos. A new fleet that will have <strong>144,720 modules<\/strong>, with a <strong>total power of 50 MW<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This time we have been awarded the works of <strong>medium and low voltage<\/strong>, as well as the entire electrical <strong>installation of the photovoltaic modules<\/strong>. Our work began in December 2021 and is scheduled to be completed by mid-April.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The park has had an investment of 32 million euros and its construction aims to avoid almost <strong>12.300 tons of CO2<\/strong> per year through the more than <strong>144.000 photovoltaic panels of 345 Wp<\/strong>. The Burgundy plant is expected to produce enough clean energy to supply a population of <strong>26.000 households a year<\/strong>. The construction of this park has an important local factor, both from industrial suppliers and the involvement of almost 250 workers until its start-up in 2022.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"1267\" src=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-14.jpg\" alt=\"\" class=\"wp-image-1267\" srcset=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-14.jpg 1024w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-14-300x225.jpg 300w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-14-768x576.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"1266\" src=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera.jpg\" alt=\"Revilla Vallejera photovoltaic park\" class=\"wp-image-1266\" srcset=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera.jpg 1024w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-300x225.jpg 300w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-768x576.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"1279\" src=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-11-768x1024.jpg\" alt=\"\" class=\"wp-image-1279\" srcset=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-11-768x1024.jpg 768w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-11-225x300.jpg 225w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-11.jpg 1024w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"1269\" src=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-8.jpg\" alt=\"\" class=\"wp-image-1269\" srcset=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-8.jpg 1024w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-8-300x225.jpg 300w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-8-768x576.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"1275\" src=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-6.jpg\" alt=\"\" class=\"wp-image-1275\" srcset=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-6.jpg 1024w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-6-300x225.jpg 300w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-6-768x576.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"1277\" src=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-5.jpg\" alt=\"\" class=\"wp-image-1277\" srcset=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-5.jpg 1024w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-5-300x225.jpg 300w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-5-768x576.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"1271\" src=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-4.jpg\" alt=\"\" class=\"wp-image-1271\" srcset=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-4.jpg 1024w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-4-300x225.jpg 300w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-4-768x576.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"1281\" src=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-3-768x1024.jpg\" alt=\"\" class=\"wp-image-1281\" srcset=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-3-768x1024.jpg 768w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-3-225x300.jpg 225w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-3.jpg 1024w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"1274\" src=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-2.jpg\" alt=\"\" class=\"wp-image-1274\" srcset=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-2.jpg 1024w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-2-300x225.jpg 300w, https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-2-768x576.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>In this work, our company has been in charge of laying medium and low voltage works, as well as the entire electrical installation of the photovoltaic modules.<\/p>\n","protected":false},"author":2,"featured_media":1510,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[111,213,206,208,183,186,210,219,182,214,181,172,207,175,212,185,217,215,209,184,216,218,220,205,211,187],"class_list":["post-1572","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects","tag-000-households","tag-000-photovoltaic-panels","tag-206","tag-208","tag-144-000-paneles-fotovoltaicos","tag-250-trabajadores","tag-250-workers","tag-219","tag-26-000-hogares","tag-300-tonnes-co2","tag-345-wp","tag-50-mw","tag-720-modules","tag-burgos","tag-completion-april","tag-construccion","tag-construction","tag-december-2021","tag-electrical-installation","tag-factor-local","tag-industrial-suppliers","tag-investment-32-million-euros","tag-local-factor","tag-medium-and-low-voltage-laying","tag-photovoltaic-park-of-revilla-vallejera","tag-proveedores-industriales"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Isel begins work in the installation of the new Revilla-Vallejera Photovoltaic Plant - ISEL Energ\u00eda<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Isel begins work in the installation of the new Revilla-Vallejera Photovoltaic Plant - ISEL Energ\u00eda\" \/>\n<meta property=\"og:description\" content=\"In this work, our company has been in charge of laying medium and low voltage works, as well as the entire electrical installation of the photovoltaic modules.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/\" \/>\n<meta property=\"og:site_name\" content=\"ISEL Energ\u00eda\" \/>\n<meta property=\"article:published_time\" content=\"2022-01-24T08:12:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-01T12:50:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-16.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Leyre Catal\u00e1n\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Leyre Catal\u00e1n\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/actualidad\\\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/actualidad\\\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\\\/\"},\"author\":{\"name\":\"Leyre Catal\u00e1n\",\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/#\\\/schema\\\/person\\\/a7cff17abcc2aeb15b95af1ed46f579f\"},\"headline\":\"Isel begins work in the installation of the new Revilla-Vallejera Photovoltaic Plant\",\"datePublished\":\"2022-01-24T08:12:00+00:00\",\"dateModified\":\"2023-02-01T12:50:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/actualidad\\\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\\\/\"},\"wordCount\":156,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/actualidad\\\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/iselenergia.com\\\/wp-content\\\/uploads\\\/parque-fotovoltaico-revilla-vallejera-16.jpg\",\"keywords\":[\"000 households\",\"000 photovoltaic panels\",\"12\",\"144\",\"144.000 paneles fotovoltaicos\",\"250 trabajadores\",\"250 workers\",\"26\",\"26 000 hogares\",\"300 tonnes CO2\",\"345 Wp\",\"50 MW\",\"720 modules\",\"Burgos\",\"completion April\",\"construcci\u00f3n\",\"construction\",\"December 2021\",\"electrical installation\",\"factor local\",\"industrial suppliers\",\"investment 32 million euros\",\"local factor\",\"medium and low voltage laying\",\"photovoltaic park of Revilla-Vallejera\",\"proveedores industriales\"],\"articleSection\":[\"Projects\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/iselenergia.com\\\/en\\\/actualidad\\\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/actualidad\\\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\\\/\",\"url\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/actualidad\\\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\\\/\",\"name\":\"Isel begins work in the installation of the new Revilla-Vallejera Photovoltaic Plant - ISEL Energ\u00eda\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/actualidad\\\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/actualidad\\\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/iselenergia.com\\\/wp-content\\\/uploads\\\/parque-fotovoltaico-revilla-vallejera-16.jpg\",\"datePublished\":\"2022-01-24T08:12:00+00:00\",\"dateModified\":\"2023-02-01T12:50:02+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/actualidad\\\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/iselenergia.com\\\/en\\\/actualidad\\\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/actualidad\\\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\\\/#primaryimage\",\"url\":\"https:\\\/\\\/iselenergia.com\\\/wp-content\\\/uploads\\\/parque-fotovoltaico-revilla-vallejera-16.jpg\",\"contentUrl\":\"https:\\\/\\\/iselenergia.com\\\/wp-content\\\/uploads\\\/parque-fotovoltaico-revilla-vallejera-16.jpg\",\"width\":1024,\"height\":768},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/actualidad\\\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inicio\",\"item\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Isel begins work in the installation of the new Revilla-Vallejera Photovoltaic Plant\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/\",\"name\":\"ISEL Energ\u00eda\",\"description\":\"Especialistas en energ\u00eda renovable\",\"publisher\":{\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/#organization\",\"name\":\"ISEL Energ\u00eda\",\"url\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/iselenergia.com\\\/wp-content\\\/uploads\\\/Untitled-2.svg\",\"contentUrl\":\"https:\\\/\\\/iselenergia.com\\\/wp-content\\\/uploads\\\/Untitled-2.svg\",\"width\":600,\"height\":268,\"caption\":\"ISEL Energ\u00eda\"},\"image\":{\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/iselenergia.com\\\/en\\\/#\\\/schema\\\/person\\\/a7cff17abcc2aeb15b95af1ed46f579f\",\"name\":\"Leyre Catal\u00e1n\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7cc48eccce5f53fe00cb72b0217168fc69736821d90d51014003c770aa369c60?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7cc48eccce5f53fe00cb72b0217168fc69736821d90d51014003c770aa369c60?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/7cc48eccce5f53fe00cb72b0217168fc69736821d90d51014003c770aa369c60?s=96&d=mm&r=g\",\"caption\":\"Leyre Catal\u00e1n\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Isel begins work in the installation of the new Revilla-Vallejera Photovoltaic Plant - ISEL Energ\u00eda","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/","og_locale":"en_US","og_type":"article","og_title":"Isel begins work in the installation of the new Revilla-Vallejera Photovoltaic Plant - ISEL Energ\u00eda","og_description":"In this work, our company has been in charge of laying medium and low voltage works, as well as the entire electrical installation of the photovoltaic modules.","og_url":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/","og_site_name":"ISEL Energ\u00eda","article_published_time":"2022-01-24T08:12:00+00:00","article_modified_time":"2023-02-01T12:50:02+00:00","og_image":[{"width":1024,"height":768,"url":"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-16.jpg","type":"image\/jpeg"}],"author":"Leyre Catal\u00e1n","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Leyre Catal\u00e1n","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/#article","isPartOf":{"@id":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/"},"author":{"name":"Leyre Catal\u00e1n","@id":"https:\/\/iselenergia.com\/en\/#\/schema\/person\/a7cff17abcc2aeb15b95af1ed46f579f"},"headline":"Isel begins work in the installation of the new Revilla-Vallejera Photovoltaic Plant","datePublished":"2022-01-24T08:12:00+00:00","dateModified":"2023-02-01T12:50:02+00:00","mainEntityOfPage":{"@id":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/"},"wordCount":156,"commentCount":0,"publisher":{"@id":"https:\/\/iselenergia.com\/en\/#organization"},"image":{"@id":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/#primaryimage"},"thumbnailUrl":"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-16.jpg","keywords":["000 households","000 photovoltaic panels","12","144","144.000 paneles fotovoltaicos","250 trabajadores","250 workers","26","26 000 hogares","300 tonnes CO2","345 Wp","50 MW","720 modules","Burgos","completion April","construcci\u00f3n","construction","December 2021","electrical installation","factor local","industrial suppliers","investment 32 million euros","local factor","medium and low voltage laying","photovoltaic park of Revilla-Vallejera","proveedores industriales"],"articleSection":["Projects"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/","url":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/","name":"Isel begins work in the installation of the new Revilla-Vallejera Photovoltaic Plant - ISEL Energ\u00eda","isPartOf":{"@id":"https:\/\/iselenergia.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/#primaryimage"},"image":{"@id":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/#primaryimage"},"thumbnailUrl":"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-16.jpg","datePublished":"2022-01-24T08:12:00+00:00","dateModified":"2023-02-01T12:50:02+00:00","breadcrumb":{"@id":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/#primaryimage","url":"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-16.jpg","contentUrl":"https:\/\/iselenergia.com\/wp-content\/uploads\/parque-fotovoltaico-revilla-vallejera-16.jpg","width":1024,"height":768},{"@type":"BreadcrumbList","@id":"https:\/\/iselenergia.com\/en\/actualidad\/isel-begins-his-work-in-the-installation-of-the-new-revilla-vallejera-photovoltaic-park\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inicio","item":"https:\/\/iselenergia.com\/en\/"},{"@type":"ListItem","position":2,"name":"Isel begins work in the installation of the new Revilla-Vallejera Photovoltaic Plant"}]},{"@type":"WebSite","@id":"https:\/\/iselenergia.com\/en\/#website","url":"https:\/\/iselenergia.com\/en\/","name":"ISEL Energ\u00eda","description":"Especialistas en energ\u00eda renovable","publisher":{"@id":"https:\/\/iselenergia.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/iselenergia.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/iselenergia.com\/en\/#organization","name":"ISEL Energ\u00eda","url":"https:\/\/iselenergia.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/iselenergia.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/iselenergia.com\/wp-content\/uploads\/Untitled-2.svg","contentUrl":"https:\/\/iselenergia.com\/wp-content\/uploads\/Untitled-2.svg","width":600,"height":268,"caption":"ISEL Energ\u00eda"},"image":{"@id":"https:\/\/iselenergia.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/iselenergia.com\/en\/#\/schema\/person\/a7cff17abcc2aeb15b95af1ed46f579f","name":"Leyre Catal\u00e1n","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/7cc48eccce5f53fe00cb72b0217168fc69736821d90d51014003c770aa369c60?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/7cc48eccce5f53fe00cb72b0217168fc69736821d90d51014003c770aa369c60?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7cc48eccce5f53fe00cb72b0217168fc69736821d90d51014003c770aa369c60?s=96&d=mm&r=g","caption":"Leyre Catal\u00e1n"}}]}},"_links":{"self":[{"href":"https:\/\/iselenergia.com\/en\/wp-json\/wp\/v2\/posts\/1572","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/iselenergia.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/iselenergia.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/iselenergia.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/iselenergia.com\/en\/wp-json\/wp\/v2\/comments?post=1572"}],"version-history":[{"count":3,"href":"https:\/\/iselenergia.com\/en\/wp-json\/wp\/v2\/posts\/1572\/revisions"}],"predecessor-version":[{"id":2251,"href":"https:\/\/iselenergia.com\/en\/wp-json\/wp\/v2\/posts\/1572\/revisions\/2251"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/iselenergia.com\/en\/wp-json\/wp\/v2\/media\/1510"}],"wp:attachment":[{"href":"https:\/\/iselenergia.com\/en\/wp-json\/wp\/v2\/media?parent=1572"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/iselenergia.com\/en\/wp-json\/wp\/v2\/categories?post=1572"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/iselenergia.com\/en\/wp-json\/wp\/v2\/tags?post=1572"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}